Tri-Dam Project

A partnership of the Oakdale and South San Joaquin Irrigation Districts

  • Home
  • Reservoirs
    • Donnells
    • Beardsley
    • Tulloch
    • Historical Data
  • About Tri-Dam
    • People
    • Meetings
    • Jobs
    • Surplus Sales
    • Open Solicitations
    • Annual Reports
    • Archive Documents
    • Historic Videos
  • News & Updates
    • Drought Updates
    • Press Releases
  • Contact

February 11, 2015

Spring 2015 Fill Schedule for Tulloch, as received from the Bureau of Reclamation

The spring filling schedule for Tulloch Reservoir is provided below. The schedule complies with Army Corps of Engineers flood control constraints, and elevations are projected to lie between the low and high bands. Note that actual elevations may vary temporarily due to inflow to Tulloch during rain events, or unforeseen operational constraints.

DatesElevation Range
FromThroughFromTo
3/24/153/30/15498.6501.6
3/31/154/6/15499.4502.4
4/7/154/13/15500.2503.2
4/14/154/20/15501.1504.1
4/21/154/27/15501.9504.9
4/28/155/4/15502.7505.7
5/5/155/11/15504.3507.3
5/12/155/18/15504.3507.3
5/19/155/25/15505.1508.1
5/26/156/1/15506.0509.0
6/2/159/15/15506.5509.5

 

Article by Greg Falken / Fill Schedule, Tulloch Reservoir

Water Data

Data For 06/28/2022

Elevation (feet above sea level)

Donnells 4,912.17

Beardsley 3,384.50

Tulloch 507.95

Storage (acre feet)

Donnells 62,718

Beardsley 88,972

Tulloch 64,429

Outflow (cubic feet/sec)

Donnells 43

Beardsley 55

Tulloch 901


*Spilling

View historical data

News & Updates

Tulloch 2022 Internal Guidance Memo—Grandfathered Facilities

April 22, 2022 by Tri-Dam Project

Tulloch Spring 2022 Fill Schedule

March 10, 2022 by Tri-Dam Project

Road Conditions

Current road conditions to Beardsley and Donnells Reservoirs can be found on their respective pages.

Copyright © 2007–2022 Tri-Dam Project · Website by Webdancers · Employee Log in · Website Log in
PO Box 1158 · Pinecrest, CA 95364-0158 · 209-965-3996