September 6, 2018

Tulloch Fall 2018 Drawdown Schedule

The fall drawdown schedule for Tulloch Reservoir is provided below. This schedule complies with U.S. Army Corps of Engineers flood control requirements. The reservoir will generally be managed to the target elevation range, however some variation may occur due to large local inflow during rain events or facility and operational constraints.

Date
From
Date
Through
Elevation
Low
Elevation
High
9/17/20189/23/2018506.0509.0
9/24/20189/30/2018504.7507.7
10/01/201810/07/2018503.5506.5
10/08/201810/14/2018502.2505.2
10/15/201810/21/2018500.9503.9
10/22/201810/28/2018499.5502.5
10/29/201803/22/2019498.6501.6

 

Article by Tri-Dam Project / Fill Schedule, Tulloch Reservoir

News & Updates

Tulloch Spring 2023 Fill Schedule

March 24, 2023 by Tri-Dam Project

Tulloch Winter 2022/2023 Drawdown Schedule

September 8, 2022 by Tri-Dam Project

Road Conditions

Current road conditions to Beardsley and Donnells Reservoirs can be found on their respective pages.

Copyright © 2007–2023 Tri-Dam Project · Website by Webdancers · Employee Log in · Website Log in
PO Box 1158 · Pinecrest, CA 95364-0158 · 209-965-3996