Tri-Dam Project

A partnership of the Oakdale and South San Joaquin Irrigation Districts

  • Home
  • Reservoirs
    • Donnells
    • Beardsley
    • Tulloch
    • Historical Data
  • About Tri-Dam
    • People
    • Meetings
    • Jobs
    • Surplus Sales
    • Open Solicitations
    • Annual Reports
    • Archive Documents
    • Historic Videos
  • News & Updates
    • Drought Updates
    • Press Releases
  • Contact

March 13, 2017

Tulloch Spring 2017 Fill Schedule

The spring filling schedule for Tulloch Reservoir is provided below, as received from the US Bureau of Reclamation. The schedule complies with Army Corps of Engineers flood control constraints, and elevations are projected to lie between the low and high bands. Note that actual elevations may vary temporarily due to inflow to Tulloch during rain events, or unforeseen operational constraints. Residents and others operating in and around the reservoir should exercise care at all times.

FromThroughLowHigh
3/21/20174/5/2017498.6502
4/6/20174/12/2017499503
4/13/20174/19/2017500504
4/20/20174/26/2017501505
4/27/20175/3/2017502506
5/4/20175/10/2017503507
5/11/20175/17/2017504508
5/18/20175/25/2017505509
5/26/20179/15/2017506.5509.5

Filed Under: Fill Schedule, Tulloch Reservoir

Water Data

Data For 04/14/2021

Elevation (feet above sea level)

Donnells 4,774.08

Beardsley 3,312.10

Tulloch 502.89

Storage (acre feet)

Donnells 14,564

Beardsley 44,472

Tulloch 58,486

Outflow (cubic feet/sec)

Donnells 27

Beardsley 140

Tulloch 649


*Spilling

View historical data

News & Updates

Tulloch Spring/Summer Season Electrical Tips

April 8, 2021 by Tri-Dam Project

Tulloch Spring 2021 Fill Schedule

March 15, 2021 by Tri-Dam Project

Road Conditions

Current road conditions to Beardsley and Donnells Reservoirs can be found on their respective pages.

Pinecrest Weather

Pinecrest
◉
28°
Fair
6:23am7:36pm PDT
Feels like: 28°F
Wind: 2mph E
Humidity: 77%
Pressure: 30.05"Hg
UV index: 0
FriSatSun
61/36°F
63/37°F
68/37°F
Weather forecast Pinecrest, California ▸

Copyright © 2007–2021 Tri-Dam Project · Website by Webdancers · Employee Log in · Website Log in
PO Box 1158 · Pinecrest, CA 95364-0158 · 209-965-3996