The 2024 Spring refill schedule for Tulloch Reservoir is provided below.  This schedule complies with U.S. Army Corps of Engineers flood control requirements.  The reservoir will generally be managed to the target elevation range, however some variation may occur due to large local inflows. 

DATE ELEVATION FROM ELEVATION TO
28 Feb to 05 Mar 495 498
06 Mar to 12 Mar 496 499
13 Mar to 19 Mar 497 500
20 Mar to 26 Mar 498 501
27 Mar to 2 Apr 499 502
3 Apr to 9 Apr 500 503
10 Apr to 16 Apr 501 504
17 Apr to 23 Apr 502 505
24 Apr to 30 Apr 503 507
1 May to 7 May 504 507
8 May to 14 May 505 508
15 May to 21 May 506 509
22 May to 28 May 506.5 509.5
29 May to 15 Sep  506.5 509

 

Note:  Lake Tulloch Spring Refill Schedule

 